Edenvale Young were commissioned to investigate the effects of a proposed HEP scheme on flood risk on the River Thames.

The scheme included the replacement of a sluice and weir system with a series of Archimedes Screws. The project was composed of two phases which investigated the impacts on flood risk due to the proposed scheme in both high and low return period events. Phase 2 related specifically to concerns raised by residents of Trowlock Island on flood risk.